The British Museum
Browse

Balancing the hull after completion of main-hull planking

Download (16.29 MB)
figure
posted on 2025-02-07, 13:50 authored by Swarup BhattacharyyaSwarup Bhattacharyya
Boat builder Amol Mondal (L) and father Panchanan (centre) check the balance of the hull after completion of main hull planking. They run a split bamboo cane to a corresponding point on the current sheer line from a datum on a longitudinal overhead datum line that is directly above one of the datums marked on the keel at the time of the keel-and-post balancing process. They will do this starboard and port, and compare the distances as an indicator of the degree of symmetry and need for correction. Brother Dilip (R) looks on.

Funding

Endangered Material Knowledge Programme

History

Rights owner

Swarup Bhattacharyya

Cultural group

Namasudra

Country

India

Place

Dihimandalghat, West Bengal

Cultural context/event

Building

Date of creation

2022-10-26

Unique ID

2022SG04-B08-0612

Usage metrics

    Endangered Material Knowledge Programme

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC