Skip to main content
Browse
Browse and Search
Search
Day seven on the chhot build
Cite
Download
(23.47 MB)
Share
Embed
figure
posted on 2025-02-07, 13:51
authored by
Zeeshan A Shaikh
Zeeshan A Shaikh
A view towards the stern of the vessel on the seventh day of the build, showing the shoring and scaffolding system of the stern area. Hull planking has been added to the third strake on the starboard side (just visible).
Funding
Endangered Material Knowledge Programme
History
Rights owner
Zeeshan Alli Shaikh
Cultural group
Namasudra
Country
India
Place
Dihimandalghat, West Bengal
Cultural context/event
Building
Date of creation
2022-10-17
Unique ID
2022SG04-B04-0189
Usage metrics
0
0
0
Categories
Digital heritage
Wood processing
Timber engineering
Post-harvest fisheries technologies (incl. transportation)
Design anthropology
Keywords
boatbuilding
chhot
progress
planking
stern
Licence
CC BY-NC-SA 4.0
Exports
Select an option
RefWorks
RefWorks
BibTeX
BibTeX
Ref. manager
Ref. manager
Endnote
Endnote
DataCite
DataCite
NLM
NLM
DC
DC