Skip to main content
Browse
Browse and Search
Search
Fitting the first starboard sub-sheer strake
Cite
Download
(28.76 MB)
Share
Embed
figure
posted on 2025-02-07, 13:50
authored by
Swarup Bhattacharyya
Swarup Bhattacharyya
View down into the bow from the stem-head, showing the first plank of the starboard sub-sheer strake (naba dali) in place, and the port side awaiting attachment of its partner.
Funding
Endangered Material Knowledge Programme
History
Rights owner
Swarup Bhattacharyya
Cultural group
Namasudra
Country
India
Place
Dihimandalghat, West Bengal
Cultural context/event
Building
Date of creation
2022-10-27
Unique ID
2022SG04-B08-0652
Usage metrics
0
0
0
Categories
Digital heritage
Wood processing
Timber engineering
Post-harvest fisheries technologies (incl. transportation)
Design anthropology
Keywords
chhot
hull
plank
sub-sheer strake
staple
Licence
CC BY-NC-SA 4.0
Exports
Select an option
RefWorks
RefWorks
BibTeX
BibTeX
Ref. manager
Ref. manager
Endnote
Endnote
DataCite
DataCite
NLM
NLM
DC
DC