Skip to main content
Browse
Browse and Search
Search
Marking the cut line for the sub-sheer strake, starboard
Cite
Download
(14.21 MB)
Share
Embed
figure
posted on 2025-02-07, 13:50
authored by
Swarup Bhattacharyya
Swarup Bhattacharyya
Boat builder Panchanan Mondal (R) extends a string from a temporary nail in the stern post that will define the starboard curve for the cutting of the existing planking, ready to attach the sub-sheer strake (naba dali).
Funding
Endangered Material Knowledge Programme
History
Rights owner
Swarup Bhattacharyya
Cultural group
Namasudra
Country
India
Place
Dihimandalghat, West Bengal
Cultural context/event
Building
Date of creation
2022-10-26
Unique ID
2022SG04-B08-0619
Usage metrics
0
0
0
Categories
Digital heritage
Wood processing
Timber engineering
Post-harvest fisheries technologies (incl. transportation)
Design anthropology
Keywords
Hull
plank
sub-sheer strake
measure
Licence
CC BY-NC-SA 4.0
Exports
Select an option
RefWorks
RefWorks
BibTeX
BibTeX
Ref. manager
Ref. manager
Endnote
Endnote
DataCite
DataCite
NLM
NLM
DC
DC